Stratton Sports Logo
STRATTON SPORTS
Technical Apparel Manufacturing Architecture

Precision Apparel Production

From tech pack analysis and physical prototype verification to controlled bulk cutting, inline quality checks, and worldwide shipping.

Core B2B Execution Pipeline

DEVELOP → SAMPLE → PRODUCE → CONTROL → DELIVER

Our 5 core milestones provide transparent oversight across your manufacturing order.

STAGE 01

DEVELOP

Tech Pack & Pattern Engineering

Turn CAD sketches, concepts, and reference garments into graded digital patterns and precise fabric specifications.

Deliverable:Approved Tech Pack & Digital Markers
STAGE 02

SAMPLE

Physical Prototype Verification

Assemble physical prototypes, test fabric stretch and tensile resilience, assess fit, and refine trims.

Deliverable:Pre-Production Sample Approval
STAGE 03

PRODUCE

Precision Cutting & Assembly

Automated fabric cutting, eco-friendly Italian sublimation, high-gauge knitting, and master seam assembly.

Deliverable:Bulk Order Garment Production
STAGE 04

CONTROL

Multi-Stage Inline Audits

100% inline stitching inspections, seam tension tests, color fastness checks, and needle detection audits.

Deliverable:Zero-Defect Quality Sign-Off
STAGE 05

DELIVER

Packaging & Global Logistics

Steam pressing, custom barcode hangtagging, protective crating, and worldwide door-to-door freight dispatch.

Deliverable:On-Time Worldwide Dispatch
Interactive Production Workflow

17-Step Manufacturing Architecture

Explore our complete end-to-end technical apparel engineering pipeline. Hover or tap any card to inspect each precision manufacturing step.

STEP 01/17
Starting with the client's tech pack or reference sample.
STEP 01
Initiation
PHASE 01 • DEVELOP

Starting with the client's tech pack or reference sample.

Client intake of physical reference garments, CAD tech packs, measurement charts, and target bill of materials.

Milestone:Digital CAD specification archive
Analyzing and defining tech packs or garment specifications.
STEP 02
Engineering Analysis
PHASE 01 • DEVELOP

Analyzing and defining tech packs or garment specifications.

Complete technical breakdown covering graded pattern geometry, seam engineering, fabric weight target, and trim specifications.

Milestone:Engineering sign-off sheet
Developing the first prototype and preliminary budgeting.
STEP 03
Prototyping
PHASE 01 • DEVELOP

Developing the first prototype and preliminary budgeting.

First physical sample creation in the sample room with preliminary cost analysis and yield optimization models.

Milestone:First physical prototype assembled
Executing and shipping the prototype.
STEP 04
Sampling Dispatch
PHASE 02 • SAMPLE

Executing and shipping the prototype.

Express global courier dispatch of verified physical prototypes with comprehensive measurement audit logs.

Milestone:Courier delivery tracking active
Sourcing bulk fabric and components.
STEP 05
Material Procurement
PHASE 02 • SAMPLE

Sourcing bulk fabric and components.

Procurement of yarn, high-gauge greige, specialized zippers, drawcords, and custom silicone or woven brand labels.

Milestone:Raw materials batch secured
Adjusting/altering the sample and obtaining approval.
STEP 06
Client Review
PHASE 02 • SAMPLE

Adjusting/altering the sample and obtaining approval.

Client fit session review, ergonomic panel adjustments, revision iterations, and final pre-production sample sign-off.

Milestone:Official client PP sign-off
Confirming final planning, consumption, and price.
STEP 07
Costing & Allocation
PHASE 02 • SAMPLE

Confirming final planning, consumption, and price.

Final calculation of exact fabric marker consumption, thread yields, accessory costs, and locked unit price quotations.

Milestone:Fixed unit pricing contract
Estimating production scheduling and deadlines.
STEP 08
Timeline Planning
PHASE 03 • PRODUCE

Estimating production scheduling and deadlines.

Line capacity booking, production milestone Gantt scheduling, and critical path timeline commitment.

Milestone:Factory line capacity booked
Performing quality control checks (internal and third-party) once components arrive, along with pattern adjustments, client coordination, and pre-production tests.
STEP 09
Quality Inspection & Testing
PHASE 03 • PRODUCE

Performing quality control checks (internal and third-party) once components arrive, along with pattern adjustments, client coordination, and pre-production tests.

Rigorous 4-point fabric inspection upon warehouse arrival: GSM verification, color fastness, shrinkage test, and lab certifications.

Milestone:Incoming material QC verified
Cutting bulk production.
STEP 10
Bulk Precision Cutting
PHASE 03 • PRODUCE

Cutting bulk production.

Automated computerized multi-ply fabric spreading and precision CAD knife cutting with tight tolerance adherence.

Milestone:Bulk cut component bundles
Conducting quality control on cut bulk production.
STEP 11
Post-Cut Audit
PHASE 04 • CONTROL

Conducting quality control on cut bulk production.

Post-cut panel audit comparing cut stacks against master paper acrylic templates to eliminate dimensional variations.

Milestone:100% cut stack dimensional check
Sorting components and preparing for sewing.
STEP 12
Assembly Prep
PHASE 03 • PRODUCE

Sorting components and preparing for sewing.

Barcode-tagged bundle sorting, thread color matching, fusing interfacing, and line-feed preparation for master seamstresses.

Milestone:Assembly lines primed
Sewing and assembling with final sewing operations induction and application of QC protocol.
STEP 13
Master Sewing & QC
PHASE 03 • PRODUCE

Sewing and assembling with final sewing operations induction and application of QC protocol.

Assembly execution with flatlock 4-needle stitching, overlock reinforcement, inline supervisor audits, and continuous tension monitoring.

Milestone:Complete assembled garments
Performing special sewing operations, attaching final accessories, ironing, individual packaging, and labeling.
STEP 14
Finishing & Packaging
PHASE 04 • CONTROL

Performing special sewing operations, attaching final accessories, ironing, individual packaging, and labeling.

Button attachment, zipper pull install, thread snipping, industrial tunnel steam pressing, barcode hangtagging, and individual poly-bagging.

Milestone:Packaged & labeled unit stock
Final quality control.
STEP 15
Final Inspection
PHASE 04 • CONTROL

Final quality control.

AQL 2.5 standard final audit: full garment measurement inspection, needle detection scan, barcode verification, and carton pack validation.

Milestone:Zero-defect quality seal
Invoicing and preparing other documents.
STEP 16
Documentation
PHASE 05 • DELIVER

Invoicing and preparing other documents.

Final commercial invoice generation, packing list breakdown, Certificate of Origin issuance, and export compliance processing.

Milestone:Export clearance documentation ready
Arranging bulk shipment and packing lists.
STEP 17
Global Dispatch
PHASE 05 • DELIVER

Arranging bulk shipment and packing lists.

Container loading, Master Airway Bill (MAWB) or Ocean Bill of Lading (B/L) issuance, and door-to-door global logistics tracking.

Milestone:Worldwide dispatch complete

R&D Policy & IP Confidentiality

All R&D work is conducted exclusively based on client specifications. Once developed garments reach production, designs and technical marker files are never shared with other clients. All tech packs, measurement sheets, and proprietary fabrics remain your confidential property.

Transparent B2B Costing

Stratton Sports delivers competitive, factory-direct OEM pricing with transparent breakdowns across fabric weight, trims, stitching, and finishing. Account managers provide itemized quotations within 24 business hours.

Stratton Sports manufacturing watermark logo
Manufacturing Excellence Since 2012

About Stratton Sports

Stratton Sports is a specialized sports gear and performance apparel manufacturer based in Sialkot, Pakistan. Founded in 2012 by Mr. Waleed Bajwa, Stratton Sports combines decades of craftsmanship with modern technical manufacturing.

Direct Sialkot OEM DeskReady to manufacture?